Translate
Share
Print
Font Size

New Commercial Development


Utility Providers

  • City of Cibolo Utilities - 210-658-9900
  • Green Valley Special Utilities District (GVSUD) - 830-914-2330
  • Guadalupe Valley Electric Coop (GVEC) - 800-223-4832
  • Utility Locates - Call "811"
  • Cibolo Creek Municipal Authority (CCMA) - 210-658-6241
  • Republic Services - Waste Collection Services
Please contact Maggie Patterson, Utility Billing Manager, by email or 210-658-9900, ext. 3131 for information concerning Waste Collection Services.

Request for Address

  • Provide site map, survey, building plan, and/or similar along with directions to the location
  • The address will be determined based on where the building and/or driveway makes contact with a public or private road. It is important that the driveway be marked if it does not already exist.
  • Provide the Guadalupe County Appraisal account number so that the parcel can be located.
  • If the land has just been purchased, provide the previous owner’s name,
  • Contact the GIS Department, William Arellano, for any additional information at
gis@cibolotx.gov.
Pre-Application Conference

A Pre-Application Conference is required prior to a formal application for approval of a required site plan and/or building permit submittal.  The Owner, Engineer, and Architect are required to attend this meeting to become familiar with the City’s development regulations and processes. The Developer may be represented by a Landowner, Engineer, Surveyor, or any other qualified professional. 

New Commercial Development (Site Plan)

With Plat & Zoning Approval (Verify with Planning Staff)

  • Pre-Application Conference - Unified Development Code (UDC)  Article 12.2.4
  • We are no longer accepting the Universal Development Application.  Please get in touch with the Planning Department for the updated application form by calling 210-658-9900x3146.  (Site Plan Application)
  • Site Plan Cover Sheet
  • Unified Development Code (UDC) 
    • Site Plan Requirement Checklist - Article 12
    • Environmental Performance Standards - Article 7
    • Fencing and Screening - Article 8
    • Off-Street Parking - Article 10
    • Lot Design Standards - Article 14
    • Landscaping - Article 17
    • Streets, Driveways and Sidewalks - Article 18
    • Water, Wastewater and Drainage - Article 19
  • Site Signage - See Ordinance Number 1188
  • Applicable Fees - See Fee Schedule
  • Review Process - Minimum 45 business days
New Commercial (Site Development Permit)

Site / Civil Development

Building Permit Requirements

  • New Commercial / Industrial Permit Application
  • Ambulatory Health Care Facility - Statement of Disclosure (Medical Facilities only)
  • Commercial Energy Compliance Checklist (ComCheck)
    • Envelope
    • Exterior Lighting
    • Interior Lighting
    • Mechanical
  • TDLR Architectural Barriers (A/B) Project Registration Number (projects over $50,000.00)
  • Plan of Record (once the project is completed)
  • GIS Shapefiles - (once the project is completed)
    • Submit final plans in Shapefile format projected to NAD 1983 State Plane Texas South Central FIPS 4204 feet.  Information may be sent on a CD / DVD or email (gis@cibolotx.gov) as a zipped folder.  If a Shapefile cannot be created, a .DWG (AutoCAD) file maybe accepted, but it must be properly projected to the aforementioned coordinate system and must contain basic information on infrastructure.
    • Specific items needed:
    • Building footprint(s)
    • Final location of all utilities along with each element’s specifications (e.g., size, type, inverts, material, slope, etc.)
Plan Review

Building Permit Fees
Impact Fees at Building Permit - Ordinance Number 1067 (Please contact City staff for calculations)

  • Drainage - Section 3.3.3 Drainage
  • Transportation - Section 3.3.4 Transportation
  • Wastewater - Section 3.3.2 Wastewater
  • Water - Section 3.3.1 Water
Cibolo Creek Municipal Authority Fee (CCMA)
  • CCMA provides to City plus $15 Administrative Fee
City Water Fees - See Fee Schedule
  • Water Meter - based on number and size of meter(s)
  • Water Deposit - based on number and size of meter(s)
  • Water Meter Install Fee - based on number and size of meter(s)
Contact Us

Susana Huerta
Assistant Director of Planning
Email Susana Huerta
Phone: 210-658-9900 ext 3141

Grant Fore
Planner II
Email Grant Fore
Phone: 210-658-9900 ext 3148

More Information

Sebastian DeAnda
Permit Tech (BB Inspections)
Email
Phone: 210-658-4175
More Information

Larisa Bonola
Permit Tech (BB Inspections)
Email
Phone: 210-658-4175
More Information
Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

Other Possible Fees17 documents

  • Contractor Registration
    document seq 0.00
  • Construction Trailer Permit Application
    document seq 0.00
  • Demolition Permit Application
    document seq 0.00
  • Electrical Permit Application
    document seq 0.00
  • Fence Permit Application
    document seq 0.00
  • Fire Alarm Permit Application
    document seq 0.00
  • Fire Line Permit Application
    document seq 0.00
  • Fire Sprinkler / Suppression Permit Application
    document seq 0.00
  • Irrigation Permit Application
    document seq 0.00
  • Mechanical (HVAC) Permit Application
    document seq 0.00
  • Mechanical - Commercial Cooking Application
    document seq 0.00
  • Medical Gas Permit Application
    document seq 0.00
  • Plumbing Permit Application
    document seq 0.00
  • Reclaim Waterline Openings Permit Application
    document seq 0.00
  • Sign Permit Application
    document seq 0.00
  • Tap Fees - by Service Request to Staff
    document seq 0.00
  • Health Inspections
    document seq 0.00